Product design: management systems: Eduqas A‑Level Design and Technology questions
Eduqas A-Level Design and Technology past-paper questions on PD4e Product design: management systems, 2018–2025, with mark schemes and examiner’s reports where available.
Past paper difficulty
Paper
All papers
Exam
All years
Calculations
Loading the full question list…
Q3(a)
The whole paper ↗Q3(b)
The whole paper ↗Q4(b)
The whole paper ↗Q4(a)(ii)
The whole paper ↗Q2(a)
The whole paper ↗Q2(b)
The whole paper ↗
All 6 questions on Product design: management systems, as a list
- June 2025, Component 1, Q3(a) (4 marks): Explain the quality control measures required to ensure accuracy and consistency when manufacturing the table shown as a one-off product. [4]
- June 2025, Component 1, Q3(b) (4 marks): Explain how Quality Assurance measures can be used by the manufacturer to ensure the table is delivered to the customer with the intended performance, design an
- June 2023, Component 1, Q4(b) (3 marks): Explain how this gauge helps speed up quality control checks. [3]
- Autumn 2021, Component 1, Q4(a)(ii) (1 mark): When casting the jewellery in pewter 3 in every 100 fail to pour correctly and 2 in every 100 tarnish because of the mould properties. These outcomes are indepe
- Autumn 2020, Component 1, Q2(a) (5 marks): Name the type of chart shown above, then compare and contrast the features of this project management system with a flowchart. [5]
- Autumn 2020, Component 1, Q2(b) (2 marks): The chart above includes a critical path. Explain the purpose of a critical path. [2]
Questions, mark schemes and examiner’s reports are © WJEC Eduqas, from their published past papers. Plumi isn’t affiliated with any exam board. Want whole papers? Eduqas A-Level Design and Technology past papers.
The Plumi iPad app also offers exam-style questions with AI feedback on your handwritten working.

![Original question 3(a): Explain the quality control measures required to ensure accuracy and consistency when manufacturing the table shown as a one-off product. [4]](https://pub-e8a9dbab8e2a4d089f52b2a45e0d0b50.r2.dev/bank/a602u10-jun25-03-a-qp.webp)


![Original question 4(b): Explain how this gauge helps speed up quality control checks. [3]](https://pub-e8a9dbab8e2a4d089f52b2a45e0d0b50.r2.dev/bank/a602u10-jun23-04-b-qp.webp)



![Original question 2(a): Name the type of chart shown above, then compare and contrast the features of this project management system with a flowchart. [5]](https://pub-e8a9dbab8e2a4d089f52b2a45e0d0b50.r2.dev/bank/a602u10-oct20-02-a-qp.webp)
![Original question 2(b): The chart above includes a critical path. Explain the purpose of a critical path. [2]](https://pub-e8a9dbab8e2a4d089f52b2a45e0d0b50.r2.dev/bank/a602u10-oct20-02-b-qp.webp)